just got done welding up the bed frame work in the ol girl. finally got a warm day after work and not doin anything else. most of the frame work is a bed frame i found at the junk yard. cut it all up and welded it in. now when i get a little money saved up ill go get some metal for the floor. but first i need to get the gas filler neck figured out. but i dont think that will be to hard. enjoy the pics and as always thanks for lookin.
Thats looking pretty good for "Re-Used" stuff. Where did you pick up the gas tank? That one looks like it fitts pretty good.