Another day of progress.
Mixed and poured half the 12" deep footers and installed all the 17" pre-cast pucks. Then late in the day poured the rest of the footers with a "mega machine" conveyor equipped concrete truck.... which I must say was way cool.
Installed 2 corner posts and we are currently in hurry up and wait mode:
Hopefully the hangers will show up tomorrow as promised,





______
John
Mixed and poured half the 12" deep footers and installed all the 17" pre-cast pucks. Then late in the day poured the rest of the footers with a "mega machine" conveyor equipped concrete truck.... which I must say was way cool.
Installed 2 corner posts and we are currently in hurry up and wait mode:
- All the 2 x 6 girts are attached by joist hangers. Lester Building sent double 2 x 8 joist hangers. They aren't your standard "Home De-pot" hangers, one flange is bent inward, the other outward. And there are left and right hangers.
- And they shorted us on about half of the splash boards.
Hopefully the hangers will show up tomorrow as promised,





______
John